Saturday, May 22, 2010

And, construction is finished!

Well, this is it!  The basement/terrace level is complete.  Now, we just have to move everything in and get it organized and I'm hoping that will be next weekend.  I can't wait to get my sewing room organized.  I still have to buy the Ikea furniture, and build it, for my sewing room and am hoping to do that sometime this summer.

Bedroom and closet

Bathroom

BedroomDenFrench doors to sewing room
Sewing room

Kitchen, still in progress

Sunday, May 2, 2010

The Basement to Coming Along

The basement is coming along.  All of the crown molding is up, baseboards down in the carpeted areas, doors in (all wide for handicap accessibility), bathroom floor down and the painters start tomorrow.  I just can't wait for the finishing touches!




The bedroom has two trays because of pipes that couldn't be moved but it works well because we will install a full wall of drapes to separate the room into a bedroom and office area.

Love the tile.  The shower will be the 13x13 tiles cut in half and a 5 piece row of the grey tile running about shoulder height around the shower walls.

Saturday, May 1, 2010

Claire's Graphic Design Senior Show

Claire is graduating!  YEAH!  She had two senior shows to prepare for; Photography Senior Exhibition and Graphic Design Senior Show.  Her graphic design show was held in the gallery at The Univ of West GA May 30, 2010 with 12 other seniors.

Graphic Design Senior Show